Reporting Structure
In a normal spreadsheet format
- Cost Classes will be listed vertically
- Typically in a "tree" structure
- Consistent with the WBS structure
- Cost Types are arrayed across the spreadsheet
- Each relating to the next in some way
Cost Types require some further explanation