What does quality assurance assure?
Quality assurance assures that
- Sufficient iterations in design, methods, materials and/or systems selection
- Are conducted to optimize design configuration
- In the project's definition and planning phase
- In close liaison with the key stakeholders
- To establish a signed-off quality assurance plan
Quality assurance is all about
- Designing quality into the product
- At the outset
- To avoid or prevent non-conformance