Quality control
When mass production was established in the early 20th century
- Production of standard parts became important
- And were tracked by a statistical technique known as "control charting"
During World War II, quality control was instituted
- With an emphasis on inspection and rejection of non-conforming products or parts
- Known as Quality Control
- An after-production approach