An interesting history
Down through the ages
- Quality was once reflected in "Pride of Workmanship"
- An attribute that now seems to be sadly lacking
- Except with some individual craftsmen
- Perhaps because "work" is seen as drudgery
- And no longer gives the satisfaction that it should
- With the advent of the industrial revolution in the 19th century, and assembly-line production
- Efficiency and output where the overriding concerns