Ten steps - 10
Note that this results in a "family tree" of elements
At the end of each branch is a work package
However, not all branches are the same length
Hence, not all WPs are at the same level in the tree structure
Note that the sum total of all the WPs, from beginning to end, must integrate into the entire system or total project deliverable
This is the time to make sure that nothing is missing!
Previous slide
Next slide
Back to first slide
View graphic version