Ten steps - 9
Step 7: Assign titles to each work package such that each is discrete and self-evident
And assign numerical identifiers to each
Based on the project's cost control Code of Accounts
Since work packages result in deliverables, they should be represented by "nouns", not "verbs"
The noun-names must be specific and not general
Reflecting the terminology of the industry with which the project is associated
Previous slide
Next slide
Back to first slide
View graphic version