Sam Makes an iVisor Call …
Connecting via SupercondTrack network…
Internet connection established…
…Thank you for choosing U2 …
…Go green, internet from any U2 broadband power line…
…Charging via SuperTrackPower Wireless…
… U2, broadband, energy, logistics and U…
"Hi Sam. Say hi to Daddy, Sara."
"Hi dear, how was your HologramMeeting today?"
"Exhausting. My engineering team managed to reach an agreement to start operations in South America. Meeting with lawyers, government officials and economists, we convinced them that this project will rejuvenate the environment and their economy. Now about our vacation..."
Samuel took a quick sip of SmartCoffee and in five minutes, Sri Lanka was a hundred miles ago. Smart packaging is range of time controlled memory materials used in everyday products. In the bin, the material gradually return into plastic spheres, easily separated, stored and remoulded.
Passing Mumbai reminded Sam about the methane economy. Pioneered by innovative engineers, and rewarded by engineering institutions, low cost anaerobic wastewater treatment facilities now produce methane and fertilizers for cities worldwide whilst recycling water inland, thereby keeping the oceans pollution free.
On both shores of the Red Sea, perpetual solar panel factories thrive. Using energy from existing panels, the factories "breed" more solar cells from desert sand. As far as the eye can see, oceans of green glass tubes, towering algal bioreactors, provide the most efficient means of extracting negative emission hydrocarbons and animal feed. Solar power and algal production will keep growing. Mirror processes around the world's deserts, now integrated into a continuous network, power the global economy, sunrise to sunrise.
|