Here is a list of nine different types of projects based on the product they
produce. The profession should think of other products of projects not listed
here and come up with an agreed list.
Type of Project
|
Product of Project (Examples)
|
1.
|
Administrative
|
installing a new accounting system
|
2.
|
Construction
|
a building or road
|
3.
|
Computer Software Development
|
a new computer program
|
4.
|
Design of Plans
|
architectural or engineering plans
|
5.
|
Equipment or System Installation
|
a telephone system or IT system
|
6.
|
Event or Relocation
|
Olympiads or a move into a new building
|
7.
|
Maintenance of Process Industries
|
petro-chemical plant or electric generating station
|
8.
|
New Product Development
|
a new drug or aerospace/defense product
|
9.
|
Research
|
a feasibility study or investigating a chemical
|
10.
|
Other
|
???
|
The following is a list of different characteristics that relate to different
projects. It was developed by analyzing the nature of the nine different types
above. It also draws on previous work as listed in the references.
See the Appendix.