Steps in the process - 2
3. Establish the terms of reference, I.e. to investigate
- What information do project staff acquire, generate, process and transmit?
- Who all are involved in these steps?
- What information is vital, useful, ignored?
- What information is needed but not generated?
- What are the required standards
- E.g. level of accuracy in cost estimates?
- What information quality controls are in place?