Structure
Consider the structure
- Does the title and introduction
- Instantly reveal the purpose?
- And respond to the requirements?
- Is the material presented in a logical and progressive order
- With a list of headings first
- Followed by the elaboration of each heading in a separate paragraph?
- Is the content written succinctly