Brainstorming: Good advice - 1
Brainstorming success
- To be successful, a brainstorming session does require careful thought and preparation
- Some suggestions follow
The facilitator
- Needs to be a "coordinator" type
- Open and generally outgoing
- With experience, enthusiasm and ability
- To relax the group, yet maintain control of the session
- An independent outsider is a good choice
- So that rank or position is not an issue
- And the group works as a team, and owns the results!