Size does matter
On a very small project
- Record keeping and distribution may be more casual
On a very large project
- Rigor and structure is essential
- Otherwise you'll end up with a big mess - with wasted time, incorrect work, and general frustration
In short
- You need a carefully designed
- Document Management Plan
- To suit the size of the project
- And capable of evolving as the project evolves