Self Control
What if I lose my temper?
- The short answer is: Don't!
If you, or your audience, appear to be losing it
- Find an excuse to break off
- To give both sides time to calm down and "regroup"
- When calmer conditions prevail
Are there times when I should lose my temper?
- Yes, but only as a deliberate strategy
- In a controlled manner, to get attention
- And then only on very rare occasions
- Otherwise, the impact will be lost