Risks
Cost-risk to buyer
- From relatively low
- I.e. most risk is with the seller
- To relatively high
- I.e. least risk for the seller
Technological risk
- From technology selected by the buyer
- I.e. technological risk is with the buyer
- To technology mostly selected by the seller
- I.e. most of the risk is with the seller