Contract formulation
Contracting
- Is the acquisition of goods and services through contract
The notion of contracting
A contract can be devised
- To reflect any number of variables
- The acquirer's contracting strategy should be designed
- To optimize the results of the overall project
- And to reduce the risk on individual contracts
- Key variables are shown on the next page