6. Preparing the WBS
- Convert the deliverable(s) into a work breakdown structure (WBS)
- Add necessary process-related work to the WBS
- Add the necessary organization-related work to the WBS
- Adjust the level of detail of the WBS as required
- Code the WBS.
- Create a responsibility matrix
- Create a master summary schedule
-