Systems Development Labor Costs
Labor costs to
- Define system requirements
- Design the system
- Design the system Infrastructure
- Code, unit test, integrate and system test the system
- Document the system
- Including training materials
- Manage the project
- Manage the technology
- Including configuration, quality control and support