Contingency - 1
A contingency allowance should cover specifically and only
- Provision for unforeseen elements of cost
- For both detailed design work as well as execution
- But within the overall scope of the assignment
- May include inflation/escalation and/or currency fluctuations
- Usually as separate contingency entries
Potential changes in scope
- Should be covered separately