Class B Estimate
General Description
- An estimate based on completed preliminary design drawings
- Upon acceptance, these estimates become the cost plans for project cost control during design
Includes
- At least two levels of a documented work breakdown structure, definition of major systems and subsystems, preliminary drawings and outline specifications
- Developed by project manager and/or subject matter experts
- Expected precision variance -10% to +20% or less