Quality in Production
Qualified quality personnel should be
- Assigned to plan the quality control program
- Given access to all applicable documentation, including
- Relevant inspection and test criteria
- Process characteristics and parameters
- Codes and regulations
- Contractual requirements
- Standards, specifications and drawings