Quality Assurance and Quality Control
The difference between quality assurance and quality control is that
- Quality assurance aims to assure that quality work and quality deliverables will be built in before work is done
- Quality control aims to determine that quality work and quality deliverables did occur after work was done
- Quality control is conducted by inspection and testing
- Of materials, workmanship and product
Quality control is all about
- Conformance to requirements