Economics & Safety
- Economics
- The probability of malfunction or failure
- The consequences of that failure
- E.g. liability, warranty, field repair, production loss, market loss, etc.
- Safety
- The probability of failure that results in a hazard
- And the consequences of that hazard
- For both operating personnel and the public