If not free, then how much?
Quality seems to be "intangible"
So, if it is not free, how do I measure the cost?
Quality can be measured as the sum of the costs of
Prevention
Detection, and
Non-conformance
Non-conformance may be divided into two headings
(1) Reactive internal failure
(2) External failure
Previous slide
Next slide
Back to first slide
View graphic version