Product Quality Grade
Quality "grade" is the measure of quality in the product
- The requirement for a product could be "high-grade"
- Or, it could be "low-grade"
- I.e. a Volkswagen would do
- Both represent quality products
- If that is what is called for
- Though a lot of people ask for a Volkswagen
- To keep down cost
- Then hope desperately to get something better!