Project Level 2 equates to MBM level
At Level 2, the LSB is the Requirements baseline
These projects are referred to as "Construction"
The art and science of Construction project management is in
- Selecting and manipulating alternative design approaches
- To implement the requirements with optimal efficiency
- I.e. the design is a dynamic baseline
The appropriate management behavior is MBM