Level 1 Project Example
A typical MBR project application would be
- A "build-to-print" type initiative
- Having a tangible product
- And a stable proven design
- The operation would be highly routine and "systematized"
This level would arguably not even be a project under many project definitions
The typical organizational structure would be a functional line operation
- Sometimes referred to as a "Jobbing shop"