Project Level 1 equates to MBR level
At Level 1 the LSB is product Design
These projects are referred to as "Production"
The art and science of Production project management is in
- Selecting and manipulating alternative procedures
- And implementing the design with optimal efficiency
- I.e. the procedures form a dynamic baseline
The appropriate management behavior is MBR