WP Characteristics - 2
- Size and duration are limited to relatively short spans of time
- To minimize the effort in evaluating work to date
- And work to complete
- It integrates with all other related WPs
- Both in technological interfaces
- And in schedule
- Represents a level where actual costs can be collected or assigned