Scope?
Not everyone is familiar with the term "scope" so let's look at that first
- A one-time nautical term meaning the sweep of a ship's mooring cable
- That is, the full extent of the area covered by the ship's cable within its freedom to move at anchor
- Although less recognized in Europe, in North America scope has come to mean
- Intention, outlook, mark shot at (i.e. target)