Variance
The scatter distance
- Is the distance from the red line
The problem
- Is that x6 and x7 are on opposite sides
- And adding them cancels them out
The solution
- Is to square the "x" readings
- To get rid of "minus" signs
To get a measure of how spread out the scatter is
- Calculate the average of the squared distances
- And this is called the "variance" written as s2