Sensitivity Analysis - 2
Methodology contd.
- Then each factor is selected in turn
- And set to highest and lowest levels
- And calculations rerun
- Their differences as a percentage
- Represent a measure of sensitivity
- A prioritized list is then assembled
- Often an obvious break point is observed
- If one or two items dominate the list
- Separate them out for individual analysis