What is sensitive analysis?
Sensitivity analysis
- Is a method for testing the degree of sensitivity
- Of a system or model's variables
- By applying incremental changes
- The "system" can be physical or notional
- And represent the whole project or major element
- The analysis determines which variables are the most significant
- Having the most impact on results
- And so helps the selection of the optimal settings
- Or best solution