Development/Definition Phase - 4
Preliminary Engineering (contd.)
- Process flow defined
- General building and systems defined
- Produce design manual
- Preparation of detailed flow sheets for process
- Preparation of piping and instrumentation diagrams
- Preparation of general layout drawings
- Evaluation of alternative schemes
- Value engineering in selection of economical alternatives
- Preparation of lists of equipment
- Establishment of architectural criteria