The Source of a Work Package
Breaking down the total project scope into identifiable pieces helps to
- Understand the project, and
- How to manage it
- As described in other Issacons, the result isa "Product Breakdown Structure"
If the "Scope of Work" is used as the source document
- The result is a (true) "Work Breakdown Structure"
Either way, the lowest developed level of a WBS branch is referred to as a Work Package