Metrics: Scope & Quality
Scope of the deliverable
- Is, or can be, defined
- In terms of functionality or other similar attributes
- The boundaries are identified
- So that the work can be contained
Scope of the project
- A work breakdown structure (WBS) can be developed
- So that time and cost can be tracked
Quality of the deliverable
- I.e. the requisite quality "grade"
Quality of the process
- I.e. the performance of the workmanship